Projects
- Agua Fria CWSA SCADA and Electrical upgrade (Design Build)
- Agua Fria CWSA Preventative Maintenance.
- Vista Redonda Water System Improvements SCADA upgrade 5ea wells and 2ea tanks(Design Build) spec bid electrical upgrade.
- Capulin Volcano National Park SCADA 1ea Tank and 1ea well spec bid.
- Santa Clara Pueblo Water System Improvements SCADA upgrade 5ea wells and 2ea tanks (Design Build).
- Acoma Pueblo and Business development Telemetry Radio system with repeater upgrade for 6 wells, 3ea tanks and treatment building.
- EPCOR Bella Vista booster station, SCADA, VFD’s, Chlorine Analyzer and Electrical upgrade (Design Build).
- EPCOR Clovis Preventative Maintenance.
- EPCOR Edgewood Preventative Maintenance.
- EPCOR Wastewater Plant Service
- EPCOR Service.
- City of Carlsbad SCADA, Wastewater Primary Lift station, 8ea lift stations and Sheep draw Water System 9ea wells, 9ea PRV stations, 2ea Booster stations, (Design Build).
- Village of Red River Water system SCADA upgrade 6ea wells and 2ea tanks (Design Build).
- City of Socorro Electrical upgrade 1ea 300HP VFD, 1ea 8" Mag Flow meter and 1ea surge Protective Capacity: 80kA/Mode & 160kA/Phase.